Date Published: 2025 | Conference materials
To access our resources you will need to be a member of UltraFacility, log in to your account or purchase a membership to view this content.
As semiconductor fabs evolve, legacy wastewater treatment systems are increasingly challenged by higher metal loads, tighter discharge limits, and limited space for expansion. This presentation shares a real-world example of retrofitting an existing facility to manage concentrated copper waste streams from electrodeposition tools, focusing on adaptability, operational resilience, and lessons learned from deploying a compact, on-site treatment solution.